Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
প্রধান লেখক: | Brac University |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/19907 |
অনুরূপ উপাদানগুলি
-
Regarding inspection report of fire pump at BRACU NCP
অনুযায়ী: Bengal Technological Corporation Ltd.(BTCL)
প্রকাশিত: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Regarding fire incidents and further precaution
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Regarding fire incidents and further precaution
অনুযায়ী: Brac University
প্রকাশিত: (2023)