Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19907 |
مواد مشابهة
-
Regarding inspection report of fire pump at BRACU NCP
بواسطة: Bengal Technological Corporation Ltd.(BTCL)
منشور في: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
بواسطة: Brac University
منشور في: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
بواسطة: Brac University
منشور في: (2023) -
Regarding fire incidents and further precaution
بواسطة: Brac University
منشور في: (2023) -
Regarding fire incidents and further precaution
بواسطة: Brac University
منشور في: (2023)