Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
| Päätekijä: | Brac University |
|---|---|
| Aineistotyyppi: | General correspondence |
| Kieli: | English |
| Julkaistu: |
Brac University
2023
|
| Aiheet: | |
| Linkit: | http://hdl.handle.net/10361/19907 |
Samankaltaisia teoksia
-
Regarding inspection report of fire pump at BRACU NCP
Tekijä: Bengal Technological Corporation Ltd.(BTCL)
Julkaistu: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
Tekijä: Brac University
Julkaistu: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
Tekijä: Brac University
Julkaistu: (2023) -
Regarding fire incidents and further precaution
Tekijä: Brac University
Julkaistu: (2023) -
Regarding fire incidents and further precaution
Tekijä: Brac University
Julkaistu: (2023)