Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19907 |
Benzer Materyaller
-
Regarding inspection report of fire pump at BRACU NCP
Yazar:: Bengal Technological Corporation Ltd.(BTCL)
Baskı/Yayın Bilgisi: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Regarding fire incidents and further precaution
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Regarding fire incidents and further precaution
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)