Engineer's instruction to construct draining box around building ground
This record consists of general correspondence regarding engineer's instruction to construct draining box around building ground of BRACU new campus project site.
المؤلف الرئيسي: | |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19904 |