Engineer's instruction to construct draining box around building ground

This record consists of general correspondence regarding engineer's instruction to construct draining box around building ground of BRACU new campus project site.

التفاصيل البيبلوغرافية
المؤلف الرئيسي: Brac University
التنسيق: General correspondence
اللغة:English
منشور في: Brac University 2023
الموضوعات:
الوصول للمادة أونلاين:http://hdl.handle.net/10361/19904