Engineer's instruction to construct draining box around building ground

This record consists of general correspondence regarding engineer's instruction to construct draining box around building ground of BRACU new campus project site.

מידע ביבליוגרפי
מחבר ראשי: Brac University
פורמט: General correspondence
שפה:English
יצא לאור: Brac University 2023
נושאים:
גישה מקוונת:http://hdl.handle.net/10361/19904