Engineer's instruction to construct draining box around building ground
This record consists of general correspondence regarding engineer's instruction to construct draining box around building ground of BRACU new campus project site.
Yazar: | |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19904 |
id |
10361-19904 |
---|---|
record_format |
dspace |
spelling |
10361-199042023-08-27T21:04:07Z Engineer's instruction to construct draining box around building ground Brac University New campus project General correspondence Draining box This record consists of general correspondence regarding engineer's instruction to construct draining box around building ground of BRACU new campus project site. 2023-08-27T06:21:02Z 2023-08-27T06:21:02Z ©2019 2019-10-12 General correspondence No. BRACU-NCP/2019/104A http://hdl.handle.net/10361/19904 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 1 page application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project General correspondence Draining box |
spellingShingle |
New campus project General correspondence Draining box Brac University Engineer's instruction to construct draining box around building ground |
description |
This record consists of general correspondence regarding engineer's instruction to construct draining box around building ground of BRACU new campus project site. |
format |
General correspondence |
author |
Brac University |
author_facet |
Brac University |
author_sort |
Brac University |
title |
Engineer's instruction to construct draining box around building ground |
title_short |
Engineer's instruction to construct draining box around building ground |
title_full |
Engineer's instruction to construct draining box around building ground |
title_fullStr |
Engineer's instruction to construct draining box around building ground |
title_full_unstemmed |
Engineer's instruction to construct draining box around building ground |
title_sort |
engineer's instruction to construct draining box around building ground |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/19904 |
work_keys_str_mv |
AT bracuniversity engineersinstructiontoconstructdrainingboxaroundbuildingground |
_version_ |
1814308486136201216 |