Regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project
This record consists of general correspondence regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/19901 |
Registros relacionados
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Regarding the temporary substation (internal substation) of the project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Regarding the cooperation for construction of 33kV source line by DESCO
por: Brac University
Publicado em: (2023) -
Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
por: Khan, Rahat, et al.
Publicado em: (2021) -
Regarding the 33 KV cable laying work by DESCO through the BRAC University new campus project site
por: Brac University
Publicado em: (2023)