Regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project
This record consists of general correspondence regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project.
Hoofdauteur: | Brac University |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/19901 |
Gelijkaardige items
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Regarding the temporary substation (internal substation) of the project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Regarding the cooperation for construction of 33kV source line by DESCO
door: Brac University
Gepubliceerd in: (2023) -
Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
door: Khan, Rahat, et al.
Gepubliceerd in: (2021) -
Regarding the 33 KV cable laying work by DESCO through the BRAC University new campus project site
door: Brac University
Gepubliceerd in: (2023)