Regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project
This record consists of general correspondence regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/19901 |
類似資料
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Regarding the temporary substation (internal substation) of the project
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Regarding the cooperation for construction of 33kV source line by DESCO
著者:: Brac University
出版事項: (2023) -
Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
著者:: Khan, Rahat, 等
出版事項: (2021) -
Regarding the 33 KV cable laying work by DESCO through the BRAC University new campus project site
著者:: Brac University
出版事項: (2023)