Regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project
This record consists of general correspondence regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project.
Glavni autor: | Brac University |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online pristup: | http://hdl.handle.net/10361/19901 |
Similar Items
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Regarding the temporary substation (internal substation) of the project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Regarding the cooperation for construction of 33kV source line by DESCO
od: Brac University
Izdano: (2023) -
Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
od: Khan, Rahat, i dr.
Izdano: (2021) -
Regarding the 33 KV cable laying work by DESCO through the BRAC University new campus project site
od: Brac University
Izdano: (2023)