Regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project
This record consists of general correspondence regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/19901 |
Documents similaires
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Regarding the temporary substation (internal substation) of the project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Regarding the cooperation for construction of 33kV source line by DESCO
par: Brac University
Publié: (2023) -
Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
par: Khan, Rahat, et autres
Publié: (2021) -
Regarding the 33 KV cable laying work by DESCO through the BRAC University new campus project site
par: Brac University
Publié: (2023)