Regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project
This record consists of general correspondence regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project.
Main Author: | Brac University |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/19901 |
Similar Items
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Regarding the temporary substation (internal substation) of the project
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Regarding the cooperation for construction of 33kV source line by DESCO
by: Brac University
Published: (2023) -
Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
by: Khan, Rahat, et al.
Published: (2021) -
Regarding the 33 KV cable laying work by DESCO through the BRAC University new campus project site
by: Brac University
Published: (2023)