Regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project
This record consists of general correspondence regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project.
Κύριος συγγραφέας: | Brac University |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/19901 |
Παρόμοια τεκμήρια
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Regarding the temporary substation (internal substation) of the project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Regarding the cooperation for construction of 33kV source line by DESCO
ανά: Brac University
Έκδοση: (2023) -
Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
ανά: Khan, Rahat, κ.ά.
Έκδοση: (2021) -
Regarding the 33 KV cable laying work by DESCO through the BRAC University new campus project site
ανά: Brac University
Έκδοση: (2023)