Regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project
This record consists of general correspondence regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project.
1. Verfasser: | Brac University |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/19901 |
Ähnliche Einträge
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Regarding the temporary substation (internal substation) of the project
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Regarding the cooperation for construction of 33kV source line by DESCO
von: Brac University
Veröffentlicht: (2023) -
Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
von: Khan, Rahat, et al.
Veröffentlicht: (2021) -
Regarding the 33 KV cable laying work by DESCO through the BRAC University new campus project site
von: Brac University
Veröffentlicht: (2023)