Regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project
This record consists of general correspondence regarding safety of 33 KV underground source cable of Merul Badda 33/11 KV substation installed inside BRAC University new campus project.
Hlavní autor: | Brac University |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/19901 |
Podobné jednotky
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Regarding the temporary substation (internal substation) of the project
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Regarding the cooperation for construction of 33kV source line by DESCO
Autor: Brac University
Vydáno: (2023) -
Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
Autor: Khan, Rahat, a další
Vydáno: (2021) -
Regarding the 33 KV cable laying work by DESCO through the BRAC University new campus project site
Autor: Brac University
Vydáno: (2023)