VO.20 - Approval of unit rates of non-schedule item rebar welding works connected to plate of steel column
This record consists of general correspondence regarding the VO.20 - approval of unit rates of non-schedule item rebar welding works connected to plate of steel column of BRACU new campus project site.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/19898 |
Registos relacionados
-
VO#20 Approval of unit rates for rebar welding works connected to plate of steel column
Por: Brac University
Publicado em: (2023) -
Proposal of rebar welding works connected to plate of steel column of BRAC University new campus project
Por: BUCG-ABC Joint Venture
Publicado em: (2023) -
VO #020 valuation of rebars welding and testing works connected to steel columns of BRAC University new campus project
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
Por: Brac University
Publicado em: (2023) -
Adding rebar dia 32mm welding works to vol. #20
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023)