VO.20 - Approval of unit rates of non-schedule item rebar welding works connected to plate of steel column
This record consists of general correspondence regarding the VO.20 - approval of unit rates of non-schedule item rebar welding works connected to plate of steel column of BRACU new campus project site.
Հիմնական հեղինակ: | Brac University |
---|---|
Ձևաչափ: | General correspondence |
Լեզու: | English |
Հրապարակվել է: |
Brac University
2023
|
Խորագրեր: | |
Առցանց հասանելիություն: | http://hdl.handle.net/10361/19898 |
Նմանատիպ նյութեր
-
VO#20 Approval of unit rates for rebar welding works connected to plate of steel column
: Brac University
Հրապարակվել է: (2023) -
Proposal of rebar welding works connected to plate of steel column of BRAC University new campus project
: BUCG-ABC Joint Venture
Հրապարակվել է: (2023) -
VO #020 valuation of rebars welding and testing works connected to steel columns of BRAC University new campus project
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023) -
Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
: Brac University
Հրապարակվել է: (2023) -
Adding rebar dia 32mm welding works to vol. #20
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023)