Reluctance to take safety measures and absence from the safety meetings
This record consists of general correspondence regarding the reluctance to take safety measures and absence from the safety meetings for BRACU new campus project.
Glavni autor: | Brac University |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online pristup: | http://hdl.handle.net/10361/19890 |
Similar Items
-
Instruction to take immediate measures on safety and security
od: Brac University
Izdano: (2023) -
Instruction to take immediate measures on safety and security
od: Brac University
Izdano: (2023) -
Necessary measures to ensure safety and properties of the project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Instruction to take adequate safety measures on the pedestrian walkway at east side
od: Brac University
Izdano: (2023) -
Instruction to ensure safety & security at BRACU new campus project (Edgeworks Limited)
od: Brac University
Izdano: (2023)