Reluctance to take safety measures and absence from the safety meetings
This record consists of general correspondence regarding the reluctance to take safety measures and absence from the safety meetings for BRACU new campus project.
Hlavní autor: | Brac University |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/19890 |
Podobné jednotky
-
Instruction to take immediate measures on safety and security
Autor: Brac University
Vydáno: (2023) -
Instruction to take immediate measures on safety and security
Autor: Brac University
Vydáno: (2023) -
Necessary measures to ensure safety and properties of the project
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Instruction to take adequate safety measures on the pedestrian walkway at east side
Autor: Brac University
Vydáno: (2023) -
Instruction to ensure safety & security at BRACU new campus project (Edgeworks Limited)
Autor: Brac University
Vydáno: (2023)