Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately

This record consists of general correspondence regarding the observation of BRACU new campus project on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately.

التفاصيل البيبلوغرافية
المؤلف الرئيسي: Brac University
التنسيق: General correspondence
اللغة:English
منشور في: Brac University 2023
الموضوعات:
الوصول للمادة أونلاين:http://hdl.handle.net/10361/19872