Rebar welding at permanent caping in D-wall
This record consists of general correspondence regarding rebar welding at permanent caping in D-wall of BRAC University new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19866 |
Benzer Materyaller
-
Rebar welding at permanent caping in D-wall
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Adding rebar dia 32mm welding works to vol. #20
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Adding rebar dia 10mm and 32mm welding works to vol. #20
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
VO#20 Approval of unit rates for rebar welding works connected to plate of steel column
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)