VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure
This record consists of general correspondence regarding the approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure of BRACU new campus building.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/19864 |
相似書籍
-
VO#053 Quotation for steel frames in auditorium structure rev.00
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Auditorium - back of house areas (Architectural Consultant Drawings)
由: WOHA Designs PTE LTD
出版: (2023) -
Request for Clarification on catwalk and auditorium structure and spiral staircase and Vo#10 quotation for additional steel structure fabrication
由: Brac University
出版: (2023) -
Approval of non-schedule item for RCC bench & floor joints
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
VO#51: Approval of unit rates of non-schedule item for supplying, fabrication & installation of study nook work
由: Brac University
出版: (2023)