VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure
This record consists of general correspondence regarding the approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure of BRACU new campus building.
Main Author: | Brac University |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/19864 |
Similar Items
-
VO#053 Quotation for steel frames in auditorium structure rev.00
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Auditorium - back of house areas (Architectural Consultant Drawings)
by: WOHA Designs PTE LTD
Published: (2023) -
Request for Clarification on catwalk and auditorium structure and spiral staircase and Vo#10 quotation for additional steel structure fabrication
by: Brac University
Published: (2023) -
Approval of non-schedule item for RCC bench & floor joints
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
VO#51: Approval of unit rates of non-schedule item for supplying, fabrication & installation of study nook work
by: Brac University
Published: (2023)