VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure
This record consists of general correspondence regarding the approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure of BRACU new campus building.
Autor principal: | Brac University |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19864 |
Ítems similars
-
VO#053 Quotation for steel frames in auditorium structure rev.00
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Auditorium - back of house areas (Architectural Consultant Drawings)
per: WOHA Designs PTE LTD
Publicat: (2023) -
Request for Clarification on catwalk and auditorium structure and spiral staircase and Vo#10 quotation for additional steel structure fabrication
per: Brac University
Publicat: (2023) -
Approval of non-schedule item for RCC bench & floor joints
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
VO#51: Approval of unit rates of non-schedule item for supplying, fabrication & installation of study nook work
per: Brac University
Publicat: (2023)