VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure
This record consists of general correspondence regarding the approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure of BRACU new campus building.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19864 |
مواد مشابهة
-
VO#053 Quotation for steel frames in auditorium structure rev.00
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Auditorium - back of house areas (Architectural Consultant Drawings)
بواسطة: WOHA Designs PTE LTD
منشور في: (2023) -
Request for Clarification on catwalk and auditorium structure and spiral staircase and Vo#10 quotation for additional steel structure fabrication
بواسطة: Brac University
منشور في: (2023) -
Approval of non-schedule item for RCC bench & floor joints
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
VO#51: Approval of unit rates of non-schedule item for supplying, fabrication & installation of study nook work
بواسطة: Brac University
منشور في: (2023)