VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure
This record consists of general correspondence regarding the approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure of BRACU new campus building.
প্রধান লেখক: | |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/19864 |
id |
10361-19864 |
---|---|
record_format |
dspace |
spelling |
10361-198642023-08-27T21:02:25Z VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure Brac University New campus project General correspondence Auditorium structure Gallery This record consists of general correspondence regarding the approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure of BRACU new campus building. 2023-08-27T04:37:32Z 2023-08-27T04:37:32Z ©2022 2022-10-24 General correspondence No.: BRACU-NCP/2022/115A http://hdl.handle.net/10361/19864 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 12 pages application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project General correspondence Auditorium structure Gallery |
spellingShingle |
New campus project General correspondence Auditorium structure Gallery Brac University VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure |
description |
This record consists of general correspondence regarding the approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure of BRACU new campus building. |
format |
General correspondence |
author |
Brac University |
author_facet |
Brac University |
author_sort |
Brac University |
title |
VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure |
title_short |
VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure |
title_full |
VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure |
title_fullStr |
VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure |
title_full_unstemmed |
VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure |
title_sort |
vo#52: approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for rcc steps of gallery in auditorium structure |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/19864 |
work_keys_str_mv |
AT bracuniversity vo52approvalofunitratesofnonscheduleitemforsupplyingfabricationinstallationofsteelframesforrccstepsofgalleryinauditoriumstructure |
_version_ |
1814309304018141184 |