Observation regarding the concrete surface quality of roof slab & preparation of mock-up
This record consists of general correspondence regarding the observation regarding the concrete surface quality of roof slab & preparation of mock-up of BRACU new campus project site.
Prif Awdur: | Brac University |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/19846 |
Eitemau Tebyg
-
Purchase order for supply & installation of precast concrete slabs on the pedestals for the roof drainage of BRACU new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
Purchase order for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom for BracU new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
Upper roof (jogging track slab)
gan: WOHA Designs PTE LTD, et al.
Cyhoeddwyd: (2023) -
Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Double slab on roof of BRAC University new campus project
gan: WEB Structures
Cyhoeddwyd: (2023)