Submitting next bill considering cost of all structural steel materials imported and deductions for the same
This record consists of general correspondence regarding submission of next bill considering cost of all structural steel materials imported and deductions for the same of BRAC University new campus project.
Prif Awdur: | Brac University |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/19841 |
Eitemau Tebyg
-
Submitting inspection checklist for concreting, structural steel and other major works
gan: Brac University
Cyhoeddwyd: (2023) -
Adjustment of LC amount with billed amount against supplied pre-fabricated steel structure
gan: Brac University
Cyhoeddwyd: (2023) -
The engineer’s instruction to complete steel structure works
gan: Brac University
Cyhoeddwyd: (2023) -
Regarding acceptance of steel structure
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Proposal resubmission of VO#010 for steel structure works
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)