Submitting Final design, drawing and BOQ of facade within 20.02.2020
This record consists of general correspondence regarding submitting final design, drawing and BOQ of facade within 20.02.2020 of BRAC University new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/19838 |
Ejemplares similares
-
Submitting final design, drawing and BOQ of facade immediately
por: Brac University
Publicado: (2023) -
Request to release balance amount under BOQ 3.6
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Initial observation on the BMS system design drawings and BOQ
por: Brac University
Publicado: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
por: Brac University
Publicado: (2023) -
Observation on the electrical design drawings and BoQ
por: Brac University
Publicado: (2023)