Adjustment of LC amount with billed amount against supplied pre-fabricated steel structure
This record consists of general correspondence regarding adjustment of LC amount with billed amount against supplied pre-fabricated steel structure for BRACU new campus project.
Автор: | Brac University |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/19813 |
Схожі ресурси
-
Reply to shipment of pre-fabricated steel structure against LC no. 0000021619010057
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Request to open the LC for structural steel work
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Shipment of pre-fabricated steel building (Shipment of steel structure against LC no. 0000021619010057 dated: 26.02.19)
за авторством: Brac University
Опубліковано: (2023) -
Regarding deduction programme against LC remaining unadjusted amount
за авторством: Brac University
Опубліковано: (2023) -
Application for 20% of the L/C price of the seventh batch steel members
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023)