Adjustment of LC amount with billed amount against supplied pre-fabricated steel structure
This record consists of general correspondence regarding adjustment of LC amount with billed amount against supplied pre-fabricated steel structure for BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19813 |
Benzer Materyaller
-
Reply to shipment of pre-fabricated steel structure against LC no. 0000021619010057
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Request to open the LC for structural steel work
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Shipment of pre-fabricated steel building (Shipment of steel structure against LC no. 0000021619010057 dated: 26.02.19)
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Regarding deduction programme against LC remaining unadjusted amount
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Application for 20% of the L/C price of the seventh batch steel members
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023)