Adjustment of LC amount with billed amount against supplied pre-fabricated steel structure
This record consists of general correspondence regarding adjustment of LC amount with billed amount against supplied pre-fabricated steel structure for BRACU new campus project.
מחבר ראשי: | Brac University |
---|---|
פורמט: | General correspondence |
שפה: | English |
יצא לאור: |
Brac University
2023
|
נושאים: | |
גישה מקוונת: | http://hdl.handle.net/10361/19813 |
פריטים דומים
-
Reply to shipment of pre-fabricated steel structure against LC no. 0000021619010057
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Request to open the LC for structural steel work
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Shipment of pre-fabricated steel building (Shipment of steel structure against LC no. 0000021619010057 dated: 26.02.19)
מאת: Brac University
יצא לאור: (2023) -
Regarding deduction programme against LC remaining unadjusted amount
מאת: Brac University
יצא לאור: (2023) -
Application for 20% of the L/C price of the seventh batch steel members
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023)