Adjustment of LC amount with billed amount against supplied pre-fabricated steel structure
This record consists of general correspondence regarding adjustment of LC amount with billed amount against supplied pre-fabricated steel structure for BRACU new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/19813 |
Ejemplares similares
-
Reply to shipment of pre-fabricated steel structure against LC no. 0000021619010057
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Request to open the LC for structural steel work
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Shipment of pre-fabricated steel building (Shipment of steel structure against LC no. 0000021619010057 dated: 26.02.19)
por: Brac University
Publicado: (2023) -
Regarding deduction programme against LC remaining unadjusted amount
por: Brac University
Publicado: (2023) -
Application for 20% of the L/C price of the seventh batch steel members
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023)