Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/19812 |
相似書籍
-
Observation on the electrical design drawings and BoQ
由: Brac University
出版: (2023) -
Request to release balance amount under BOQ 3.6
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
由: Brac University
出版: (2023) -
Submitting final design, drawing and BOQ of facade immediately
由: Brac University
出版: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
由: Brac University
出版: (2023)