Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Автор: | Brac University |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/19812 |
Схожі ресурси
-
Observation on the electrical design drawings and BoQ
за авторством: Brac University
Опубліковано: (2023) -
Request to release balance amount under BOQ 3.6
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
за авторством: Brac University
Опубліковано: (2023) -
Submitting final design, drawing and BOQ of facade immediately
за авторством: Brac University
Опубліковано: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
за авторством: Brac University
Опубліковано: (2023)