Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19812 |
Benzer Materyaller
-
Observation on the electrical design drawings and BoQ
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Request to release balance amount under BOQ 3.6
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Submitting final design, drawing and BOQ of facade immediately
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)