Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Huvudupphovsman: | Brac University |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/19812 |
Liknande verk
-
Observation on the electrical design drawings and BoQ
av: Brac University
Publicerad: (2023) -
Request to release balance amount under BOQ 3.6
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
av: Brac University
Publicerad: (2023) -
Submitting final design, drawing and BOQ of facade immediately
av: Brac University
Publicerad: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6