Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Главный автор: | Brac University |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/19812 |
Схожие документы
-
Observation on the electrical design drawings and BoQ
по: Brac University
Опубликовано: (2023) -
Request to release balance amount under BOQ 3.6
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
по: Brac University
Опубликовано: (2023) -
Submitting final design, drawing and BOQ of facade immediately
по: Brac University
Опубликовано: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
по: Brac University
Опубликовано: (2023)