Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Hoofdauteur: | Brac University |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/19812 |
Gelijkaardige items
-
Observation on the electrical design drawings and BoQ
door: Brac University
Gepubliceerd in: (2023) -
Request to release balance amount under BOQ 3.6
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
door: Brac University
Gepubliceerd in: (2023) -
Submitting final design, drawing and BOQ of facade immediately
door: Brac University
Gepubliceerd in: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
door: Brac University
Gepubliceerd in: (2023)