Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/19812 |
Documents similaires
-
Observation on the electrical design drawings and BoQ
par: Brac University
Publié: (2023) -
Request to release balance amount under BOQ 3.6
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
par: Brac University
Publié: (2023) -
Submitting final design, drawing and BOQ of facade immediately
par: Brac University
Publié: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
par: Brac University
Publié: (2023)