Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/19812 |
Ejemplares similares
-
Observation on the electrical design drawings and BoQ
por: Brac University
Publicado: (2023) -
Request to release balance amount under BOQ 3.6
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
por: Brac University
Publicado: (2023) -
Submitting final design, drawing and BOQ of facade immediately
por: Brac University
Publicado: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
por: Brac University
Publicado: (2023)