Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Κύριος συγγραφέας: | Brac University |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/19812 |
Παρόμοια τεκμήρια
-
Observation on the electrical design drawings and BoQ
ανά: Brac University
Έκδοση: (2023) -
Request to release balance amount under BOQ 3.6
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
ανά: Brac University
Έκδοση: (2023) -
Submitting final design, drawing and BOQ of facade immediately
ανά: Brac University
Έκδοση: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
ανά: Brac University
Έκδοση: (2023)