Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
1. Verfasser: | Brac University |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/19812 |
Ähnliche Einträge
-
Observation on the electrical design drawings and BoQ
von: Brac University
Veröffentlicht: (2023) -
Request to release balance amount under BOQ 3.6
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
von: Brac University
Veröffentlicht: (2023) -
Submitting final design, drawing and BOQ of facade immediately
von: Brac University
Veröffentlicht: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
von: Brac University
Veröffentlicht: (2023)