Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Prif Awdur: | Brac University |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/19812 |
Eitemau Tebyg
-
Observation on the electrical design drawings and BoQ
gan: Brac University
Cyhoeddwyd: (2023) -
Request to release balance amount under BOQ 3.6
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
gan: Brac University
Cyhoeddwyd: (2023) -
Submitting final design, drawing and BOQ of facade immediately
gan: Brac University
Cyhoeddwyd: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
gan: Brac University
Cyhoeddwyd: (2023)