Initial observation on the BMS system design drawings and BOQ
This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.
Autor principal: | Brac University |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19812 |
Ítems similars
-
Observation on the electrical design drawings and BoQ
per: Brac University
Publicat: (2023) -
Request to release balance amount under BOQ 3.6
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
per: Brac University
Publicat: (2023) -
Submitting final design, drawing and BOQ of facade immediately
per: Brac University
Publicat: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
per: Brac University
Publicat: (2023)