Quotation for the additional wall attached to the diaphragm wall
This record consists of general correspondence regarding the quotation for the additional wall attached to the diaphragm wall of BRACU new campus project site.
Autor principal: | Brac University |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19811 |
Ítems similars
-
Additional wall attached to diaphragm wall
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Further clarification on quotation for additional wall attached to the D-Wal
per: Brac University
Publicat: (2023) -
Revised proposal for additional wall attached to diaphragm wall of BRAC University new campus project
per: BUCG-ABC Joint Venture
Publicat: (2023) -
Construction of strengthening wall attached to diaphragm wall
per: Brac University
Publicat: (2023) -
Clarification on quotation for additional wall attached to the D-wall
Publicat: (2023)