Submitting final design, drawing and BOQ of facade immediately
This record consists of general correspondence regarding submitting final design, drawing and BOQ of facade immediately of BRAC University new campus project.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/19809 |
相似書籍
-
Submitting Final design, drawing and BOQ of facade within 20.02.2020
由: Brac University
出版: (2023) -
Initial observation on the BMS system design drawings and BOQ
由: Brac University
出版: (2023) -
Request to release balance amount under BOQ 3.6
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Observation on the electrical design drawings and BoQ
由: Brac University
出版: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
由: Brac University
出版: (2023)