Submitting final design, drawing and BOQ of facade immediately
This record consists of general correspondence regarding submitting final design, drawing and BOQ of facade immediately of BRAC University new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19809 |
Podobne zapisy
-
Submitting Final design, drawing and BOQ of facade within 20.02.2020
od: Brac University
Wydane: (2023) -
Initial observation on the BMS system design drawings and BOQ
od: Brac University
Wydane: (2023) -
Request to release balance amount under BOQ 3.6
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Observation on the electrical design drawings and BoQ
od: Brac University
Wydane: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
od: Brac University
Wydane: (2023)