Submitting final design, drawing and BOQ of facade immediately
This record consists of general correspondence regarding submitting final design, drawing and BOQ of facade immediately of BRAC University new campus project.
Hoofdauteur: | Brac University |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/19809 |
Gelijkaardige items
-
Submitting Final design, drawing and BOQ of facade within 20.02.2020
door: Brac University
Gepubliceerd in: (2023) -
Initial observation on the BMS system design drawings and BOQ
door: Brac University
Gepubliceerd in: (2023) -
Request to release balance amount under BOQ 3.6
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Observation on the electrical design drawings and BoQ
door: Brac University
Gepubliceerd in: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
door: Brac University
Gepubliceerd in: (2023)