Submitting final design, drawing and BOQ of facade immediately
This record consists of general correspondence regarding submitting final design, drawing and BOQ of facade immediately of BRAC University new campus project.
Glavni autor: | Brac University |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online pristup: | http://hdl.handle.net/10361/19809 |
Similar Items
-
Submitting Final design, drawing and BOQ of facade within 20.02.2020
od: Brac University
Izdano: (2023) -
Initial observation on the BMS system design drawings and BOQ
od: Brac University
Izdano: (2023) -
Request to release balance amount under BOQ 3.6
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Observation on the electrical design drawings and BoQ
od: Brac University
Izdano: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
od: Brac University
Izdano: (2023)